ACQUISITION

Cassette flooring

No items found.
Bois épicéa tri-plis

Wooden modules within an aluminum frame (known as Cassettes) assembled on a metal structure. Its peripheral 'ring beam' profile allows for the integration of tempered glass panels, making it fully compatible with our Blackline Verrière and Grand Palais Glasshouse.

CTS approval*
Specifications
Stowage
More pictures
Fewer photos

A sturdy foundation

Le plancher cassette est une solution modulable et robuste, idéale pour créer des surfaces planes sur tout type de terrain. Facile à installer grâce à ses panneaux interchangeables,il garantit confort et sécurité tout en s'adaptant à différents styles d'événements grâce à des finitions personnalisables.

Specifications

Thickness
3 mm aluminum / 21 mm wood
Bare canvas weight
Weight: finished canvas
Custom-made possible
No
Soil types
All
Easy storage
No
Walls
No
All seasons
Yes
Lifespan
10 years
Framing
Double-layer galvanized steel
Sizes
Starting from 25 m²
Canvas
Capacity
1 à 1,5 m² per person

Stowage

Achoring
5 cm stake
Ballast
Levelling
Leveling post from 20 to 80 cm

Our tents and structures

Find the structure that best suits your business
No items found.

Flooring

We guarantee perfect and consistent stability on your site with our self-supporting floor, featuring a double-layer steel framework. This flooring solution significantly enhances your reception spaces. Our pricing is indicative and may be adjusted following an on-site inspection, considering the terrain’s nature and elevation changes.

Be Lounge guarantees

After the purchase of your equipment, our commitment to you continues to ensure your peace of mind. Our experienced teams take care of the assembly, ensuring that it is installed correctly and safely. We provide you with a certificate attesting to the quality of the installation, thus offering you additional assurance as to the reliability and sustainability of your investment.

The steps of your purchase

1. Customer project

The process begins with the receipt of customer requests, accompanied by photos of the location where the structure will be installed as well as the desired dimensions.

2. Sending the quotation

Once the information is received, we draw up a detailed estimate based on the specific needs of the client and the characteristics of the project.

3. Technical visit

A project manager visits the site to conduct a thorough site survey and study the feasibility of the project. This step makes it possible to take into account technical and environmental constraints.

4. Final adjustment

Following the identification, our sales representatives adjust the quotation taking into account the observations of the technical team. A final quotation is then sent to you for final confirmation.

5. Validated budget

Once the budget has been validated, the customer then pays a deposit in order to start production.

6. Start of production

An installation date is agreed with the customer, thus ensuring effective planning and optimal coordination for the implementation of the project.
Sale